Kitchen Cabinet Installation Checklist: How Homeowners Can Prepare
Before a cabinet crew arrives, the kitchen should be empty, the old cabinets and countertop gone, the water and gas disconnected, the walls repaired and every appliance chosen. On install day the crew sets and levels the boxes, joins them into runs, hangs the doors and fits the fillers and trim. The countertop template comes after that, never before. The lists below run in the order the work happens, so you can check them off as the date gets closer.
While the cabinets are on order
The weeks between placing the order and delivery are when the decisions that cannot be undone on install day get made.
- Sign off on the final layout drawing and give the designer the model number of every appliance. A changed refrigerator or range after the order is placed can mean different cabinets.
- Agree on who removes the old cabinets and countertop, and on what date. The room has to be bare before delivery.
- Book a licensed plumber and electrician for three visits: disconnecting before demolition, any changes inside the walls before the cabinets go in, and reconnecting after the countertop is installed.
- Finish wall repairs and get primer and a first coat of paint on. Painting behind and above cabinets is far easier with nothing in the way, and touch-ups afterward are small.
- Settle the flooring sequence. Our article on installing flooring before or after the cabinets covers the trade-offs for each floor type.
- Order the sink and faucet. Both need to be on site for the countertop template, and a sink that arrives late holds up the stone.
- Buy the cabinet knobs and pulls, or at least choose them, and ask whether the crew will drill for and fit them.
If the dates feel tight, our guide to cabinet and countertop lead times shows which steps can overlap and which cannot.
The week of delivery
Ask whether the cabinets will be delivered ahead of the install crew or arrive with it. If they come ahead, these steps apply.
- Clear a staging area inside the house. Cabinets are wood products, and a damp basement or an unheated garage exposes them to moisture swings before they are ever hung. A dry room near the kitchen is better.
- Walk the route from the driveway to the kitchen with a tape measure. Check the narrowest doorway, any tight stair turn and low light fixtures. Tall pantry and oven cabinets are the pieces that get stuck.
- When the delivery arrives, count the cartons and match the labels against your order. Knowing how to read the line items on a cabinet quote makes this a quick job.
- Look over each carton for crushed corners or punctures and photograph anything suspect before it is opened. Report damage right away, while a replacement part can still arrive before install day.
- Leave the cabinets in their packaging until the crew opens them. The cartons protect the finish while other trades are still working.
The day before
- Empty the kitchen completely, including the walls, the windowsills and the hallway that leads to it.
- Confirm the water to the sink and the gas to the range are shut off and capped by your plumber, and that you know which breakers feed the kitchen.
- Protect the floors along the delivery route and hang plastic over open doorways to keep dust out of the rest of the house.
- Set up a temporary kitchen in another room with the refrigerator, a microwave and a place to wash dishes. Plan on using it until the countertop and plumbing are finished, which is later than the day the cabinets go in.
- Arrange a spot for pets and small children away from the work, and leave the driveway open for the crew.
Install day
Aqua Kitchen installs the cabinets it sells with its own crews, in the order described at the top of this checklist. Leveling comes first because floors and walls are rarely true, and everything that follows, from door alignment to the countertop, depends on the boxes sitting flat and square.
Your job that day is to be reachable. A few decisions are easier to make standing in the room: exactly where pulls sit on the doors and drawers if the crew is fitting them (drilled holes are permanent), how a filler meets an uneven wall, and how the crown molding finishes at the ceiling. If you cannot be home, walk through those points with the lead installer by phone before any drilling.
| Task | Who handles it |
|---|---|
| Leveling boxes, joining runs, hanging doors, fillers and trim | Aqua Kitchen install crew |
| Disconnecting and reconnecting the sink, dishwasher and gas | Your licensed plumber |
| Outlets, lighting and appliance circuits | Your licensed electrician |
| Wall repair, paint, flooring and tile | Your contractor, or you |
| Countertop template, fabrication and installation | Aqua Kitchen, once the cabinets are set |
Before the crew leaves
Walk the kitchen with the lead installer and the layout drawing in hand.
- Open and close every door and drawer. Gaps between doors should be even, and nothing should rub.
- Compare each cabinet with the drawing, then measure the refrigerator, range and dishwasher openings against the appliance specifications.
- Check that fillers, toe kicks, end panels and crown are in place, or listed as still to come.
- Count the shelves and confirm the shelf pins were left with you.
- Write down any scratch, dent or missing part and photograph it. Ask when the replacement is expected and who returns to fit it.
After the cabinets: the countertop template
The stone is measured from the installed cabinets, so the template visit is booked only after the boxes are set and level and the sink and faucet are on site. Our digital template takes 30 to 60 minutes. From template to installed countertop commonly runs one to two weeks, and plumbing is usually reconnected the day after the stone goes in, so keep the temporary kitchen running until then.
Two rules protect that schedule. Do not change the layout after the template, because any change restarts it. And leave the base cabinets empty until the countertop is in, since the installers need clear access to them. What happens during that visit is explained in our guide to how countertop templating works.
Line up your install date
If your cabinets are coming from us, the Aqua Kitchen installation page describes the installation process, so you can match this checklist to your own dates. If you are still choosing, the full cabinet collection is online, and our walkthrough of the stages of a kitchen remodel shows what each trade does before and after the cabinet crew.